Eden — User Manual · Comprehensive Guide Back
eden
Environmental Compliance Platform
The Company
User Manual
Version 1.0 · October 2026
A guide for regulated companies and their teams
Recording your monitoring data, filing your returns, and the grade you are given

Contents

Part 1 — Foundations
Part 1 · Start here
Welcome to Eden
Getting Started
Installing the Eden App
Finding Your Way: the Sidebar
Signing In and Keeping Your Account Safe
Understanding User Roles
Workspaces, Teams & Data Privacy
Setting Up Your Company
Company Branding
Subscription & Payments
Entering Monthly Monitoring Data
Sampling Points
Operations & Waste Data
EPA Submissions
Data Lock After Submission
Annual Environmental Report (Form AER-1)
Cover Pages on Reports
Reading Your Dashboard
The Colour Grade
Certificates & Performance Records
The Sustainability Suite & Action Board
Places, Indicators & Evidence
Adding and Managing Places
Recording and Checking Observations
The Indicator Library
The Map
Choosing Your Modules
Who Can Publish to Everyone
Working in the Eden Modules
Biodiversity, Land, Marine & Natural Capital
Climate Indicators, Risk & Adaptation
Impact Assessment, Waste, Water & Remote Sensing
Early Warning & Citizen Reports
Projects, Finance & Carbon Markets
Research, Open Data & the Assistant
Multi-Country Compliance
Carbon Accounting — Scope 1, 2 and 3
ESG Reporting and the Frameworks
Health & Safety
Risk Registers and Climate Scenarios
Predictive Warnings and Anomaly Detection
Sensors and Integrations
Working Offline & App Updates
Keyboard Shortcuts
Troubleshooting
Frequently Asked Questions
Glossary

Welcome to Eden

Eden is an environmental compliance platform for industry and for the agencies that regulate it. It replaces paper logbooks, scattered spreadsheets and email-based reporting with a single system where companies enter their monitoring data, officers review submissions and conduct audits, and regulators compile the reports they need.

Eden is not written for any one country’s law. Each national environmental agency configures its own: the statutes it enforces, the levels it permits, the questions its officers score on site, the month its reporting year begins, and the currency its penalties are quoted in. Those rules govern that country’s companies and nobody else’s, and no agency can read or change another’s. The first agency to run on Eden was the Environmental Protection Agency in Ghana, and it remains the reference deployment; where this manual names a country, it is as an example.

What Eden Does

Built by Wisdsol Tech, configured by each agency. The reporting calendar, the permitted levels and the audit questions are not fixed in the software: every regulator sets its own, including the month its reporting year begins.

Who Uses Eden

Getting Started

Receiving Your Account

Companies request access via the Request Account page. After payment proof is uploaded and an Admin approves the request, login credentials are emailed to the contact address provided.

EPA Staff and Sector Heads receive accounts directly from their own EPA Admin via the User Management interface, and join that administrator’s agency automatically, so they see their own country and no other. Staff access itself is granted by Wisdsol.

Logging In

1
Visit the platform URL your-domain.com/login
2
Enter your username and password — the one you chose from the link in your welcome email — and your authenticator code if asked
3
Click Sign In — you'll see a personalised welcome message and be taken to your dashboard
⚠ First sign-in. Your welcome email has a link to choose your password; it works once, for three days. If an administrator gave you a first password, Eden asks you to choose your own straight away.

Navigating Eden

Every page has three areas:

Your dashboard: entry counts, category performance and quick actions for the selected monitoring year.

Installing the Eden App

Eden can be installed on your phone, tablet or computer like an ordinary app. It opens in its own window from your home screen or desktop, starts faster, and keeps itself up to date. No app store is involved and nothing extra is charged.

Android phones and tablets

1
Open Eden in Chrome — Samsung Internet and Edge work too.
2
Tap Install Eden — The button appears at the bottom-right of the screen, or open the browser menu ⋮ and choose Install app.
3
Confirm — Eden appears in your app drawer and on your home screen.

iPhone and iPad

1
Open Eden in Safari — Apple only allows installing from Safari.
2
Tap the Share button — The square with an arrow pointing up, in the toolbar.
3
Choose Add to Home Screen, then Add — Tapping Install Eden in the app shows these same steps on screen.

Windows, Mac, Linux and Chromebook

In Chrome or Edge, click the install icon at the right-hand end of the address bar, or choose Install app from your user menu (top-right) inside Eden. On a Mac using Safari, choose File → Add to Dock.

💡 No install button? It only appears in browsers that support installing, and disappears once Eden is installed. If you closed it with ✕, it returns after 14 days — or use Install app in your user menu at any time.
Removing the app works like any other app on your device. Your data is kept safely on the server, so reinstalling brings everything back.
Eden on a phone, installed from the home screen and running full-screen.

Finding Your Way: the Sidebar

Eden has two sidebars, because it is really two things: the monitoring system a company files its returns through, and the sustainability suite it manages everything else in. The Sustainability Suite link moves between them.

The monitoring sidebar

Grouped into Workspace, Monitoring & data, Reporting and Organisation. Which sections you see depends on your role.

The suite sidebar

The suite holds every module your organisation has switched on — from Places & indicators and compliance to biodiversity, water, projects and the assistant; see Choosing Your Modules. The switcher at the top moves between them, and every module follows the same three-part shape:

Every screen appears in one place only. Where a page and a records table cover the same thing — incidents, devices, risks — the sidebar lists the page, because it filters and summarises; its header carries a link to the full table for adding and editing.

Working with the sidebar

Go to: any screen by name

To reach a screen in another module, press Go to… on the top bar, or press / anywhere (Ctrl K also works), and type part of its name — permits, water, surveys. It searches every module your organisation has switched on, plus your own menu, and lists the screens you opened recently. On a record’s page, the link above its title goes one level up.

Regulators see one group nobody else does. Under Compliance, Configure my country holds your own laws, limits and audit questions.
Eden in dark mode.

Signing In and Keeping Your Account Safe

Company Regulator

Eden holds permits, monitoring results, audit findings and payment records. Everything in this chapter is on one page: your avatar → Security & sign-in.

Your first password

New accounts receive an email with a link to choose their own password. The link works once and for three days; after that, use Forgot your password? on the sign-in page. If an administrator gave you a first password, Eden asks you to choose your own before anything else. A password must be at least 12 characters and cannot be a common password, numbers only, or too like your username.

Wrong passwords

After the third wrong password, sign-in to that account is held for 15 minutes — even the right password is refused. Wait, or reset your password: a new password lifts the hold at once. Three wrong two-factor codes hold the account the same way.

Two-factor sign-in

After your password, Eden asks for a 6-digit code from an authenticator app on your phone. Required for Eden's own administrators and regulator administrators; recommended for everyone.

1
Install Google Authenticator, Microsoft Authenticator, Authy or 1Password.
2
Open Security & sign-in → Set up two-factor sign-in and scan the QR code.
3
Type the current 6-digit code and click Switch on.
4
Save the ten backup codes — shown once; each signs you in once if you lose your phone.

Lost your phone and your codes? Ask your platform administrator to reset your two-factor sign-in.

How long you stay signed in

A sign-in ends after 30 minutes without activity and at most 12 hours after you signed in. Sign out everywhere else on the security page signs out every other device at once.

⚠ Never share a code or a password. Nobody at Eden or at your regulator will ask for either.

Understanding User Roles

Each Eden account has a single role that determines which pages and actions are available.

Company Company

Used by industrial facility staff. Can:

Companies cannot see other companies' data or any permissible parameter limits.

EPA Staff EPA Staff

EPA officers assigned to specific companies. Can:

Sector Head Sector Head

Senior officers overseeing all companies in a specific industry sector. Same capabilities as EPA Staff plus:

EPA Admin EPA Admin

Runs one country’s agency, with full read/write access inside it and none outside it. Can:

An Agency Administrator does not administer the platform: the shared reference data, the agencies themselves and another country’s anything are all out of reach.

Workspaces, Teams & Data Privacy

Each subscriber works in a private workspace. Your monitoring data, submissions, reports and suite records are visible only to:

No other subscriber can see your data, even by guessing a web address. Every page checks who you are before showing a record.

Inviting your team

1
Open Team Members — In the Organisation section of the sidebar.
2
Create or choose a role — Roles decide what a member can do — enter data, view reports, submit to the EPA, manage members, and so on.
3
Send an invite link — The person joins with their own login. Never share your own password.
⚠ Your plan sets the number of users. If an invite is refused, you have reached your plan's user limit — upgrade under My Subscription.

Your workspace page

Open My workspace from the user menu. It lists the companies in your workspace with their plans and user seats, your team size, and who can see your data. Account owners can set a display name, logo and contact email.

⚠ Suspended workspace. If a subscription lapses the workspace may be suspended: you see a notice with the reason instead of your dashboard. Nothing is deleted, and access returns as soon as it is reactivated.
Your workspace: the companies in it, user seats, your team, and exactly who can see your data.

Language & region

Choose Language & region in the user menu to set the language Eden speaks to you in and the time zone for dates and times. The choice follows your account to any device.

Language and region settings.

Setting Up Your Company

Creating Your Monitoring Year

Eden organises all data by monitoring year. Before entering any data, create a year for the calendar year you're reporting on.

1
Go to Dashboard — if no monitoring year exists, you'll see a prompt to create one.
2
Click "New Monitoring Year" and enter the year (e.g. 2025).
3
Save — the year becomes the active context for all data entry.
💡 Tip. You can switch between monitoring years anytime via the year pills at the top of every data page.
The company profile, with the “Where you operate” panel for adding the countries you work in.

Company Branding

Customise how your company appears on every PDF report Eden generates.

Uploading Your Logo

  1. Sidebar → Branding.
  2. Under Company Logo, click Choose File and select your logo image.
  3. Click Save Logo.

Square format (400×400 px) works best. PNG with transparent background looks cleanest. The logo appears in:

Cover Image

Upload a wide hero image (16:9, recommended 1600×900 px) of your facility. This image becomes the front-page background on comprehensive reports. Pick something representative — a photo of your plant, operations area, or facility from the outside.

Removing Images

Click the small Remove button below any uploaded image to delete it. Reports will fall back to a default Eden-branded cover.

Subscription & Payments

Manage your subscription plan and payments via Mobile Money.

Viewing Your Subscription

Sidebar → My Subscription. The hero panel shows your current plan, status, and days remaining.

Choosing or Upgrading a Plan

1
Browse Available Plans — Each plan card shows price (GHS), duration, max users, and features. Featured plans have a "POPULAR" ribbon.
2
Click a plan card — This reveals the payment form below. Your current plan is disabled.
3
Pay via Mobile Money — The page shows the EPA-Eden MoMo number, account name, and merchant ID. Send the exact amount.
4
Fill payment details — Your MoMo number, account name, transaction reference from SMS, amount paid.
5
Upload payment proof — A screenshot of the MoMo SMS confirmation. Required.
6
Submit for Review — Admin reviews and approves the upgrade. The new plan activates on your subscription page.

Pending & History

While a request is awaiting admin review, you cannot submit another. The bottom of the page shows your last 10 subscription requests with status pills, amounts, transaction references, and review notes.

Entering Monthly Monitoring Data

The Data Entry page is a pivot grid: parameters as rows, all 12 months as columns. You can enter any combination of values across any subset of months.

The Pivot Grid Workflow

1
Open Data Entry. Sidebar → Data Entry.
2
Select a Category. e.g. Air Emissions, Wastewater Quality. The full pivot grid loads with parameters as rows and 12 months as columns.
3
Pick active months. Use the month chips at the top — click to toggle, or use Q1, Q2, Q3, Q4, Select all, Clear shortcuts. Inactive months grey out.
4
Fill in values. Use Tab or arrow keys to navigate cells. Cells with previously saved data show with a green tint.
5
Click Save Entries (or press Ctrl+S). All values across all selected months save in one transaction.

Adding a Custom Parameter

If a parameter you need isn't in the system list, click + Add custom parameter at the top of the pivot grid. Enter:

The new parameter is saved permanently and immediately appears as a row in the grid.

⚠ Permissible limits. Companies do not see Min/Max columns or exceedance highlighting. These are visible only to EPA staff and administrators when reviewing submissions.
Data entry: choose a sampling point and category, then fill the grid month by month.

Sampling Points

Eden organises monitoring locations into three categories, each with a distinct regulatory purpose:

M Monitoring Point — routine, day-to-day operational sampling. Used for trend analysis and internal monitoring.
C Compliance Point — permit-mandated locations. Readings here determine your regulatory compliance with EPA limits.
S Surveillance Point — investigative or special-purpose monitoring (e.g. following an incident).

Why it matters: The same parameter can have different readings at different points (pH at Outfall A vs Outfall B in the same month). Eden stores them as separate readings, enabling proper multi-point monitoring required by most permits.

Defining a Sampling Point

  1. Open Sampling Points from the sidebar.
  2. Enter a clear name (e.g. "Outfall A", "Stack 1", "Boundary North").
  3. Pick the category — make sure permit-required points are marked Compliance.
  4. Optionally add description and GPS coordinates for traceability.
  5. Click Add Sampling Point.

You can also add points on the fly from the data entry page using the Quick Add button.

Editing/Deleting: If a sampling point has measurements attached, deleting it disables it instead — preserving data integrity. Disabled points won't appear in pickers but historical data remains.

Operations & Waste Data

The Operations & Waste page collects monthly quantified data for AER-1 Sections C, D, and E.

What's Captured

Section C — Operations & Production

Section D — Waste Generation & Management

Section E — Environmental Incidents & Compliance

Each sub-section has a pivot grid with months as columns, just like main data entry. Values save automatically as you type. The data flows directly into the Annual Environmental Report.

EPA Submissions

EPA Submissions package your monitoring data into formal reports for specific reporting periods.

Reporting Periods

Creating a Submission

1
Go to EPA Submissions in the sidebar.
2
Click + New Submission.
3
Choose the period type, the period value, and the monitoring year. The system pulls data automatically.
4
Review the auto-populated pivot table.
5
Click Submit to EPA. Status changes from Draft to Submitted.

Submission Statuses

Printing a Submission

From the submission detail page, click Print. A landscape A4 layout opens with the print toolbar at the top — click Print / Save PDF or use Ctrl+P.

EPA submissions: every monthly, quarterly, termly and annual report you have sent.

Data Lock After Submission

⚠ Important: Once you submit data to EPA, the underlying monthly data is locked from edit. This is by design — submitted data is regulatory record.

What Gets Locked

When you submit a Monthly, Quarterly, Half-yearly, Termly, or Annual report, all monitoring data covering those months becomes read-only for you. Specifically: any submission with status Submitted, Under Review, or Accepted locks the underlying months.

What This Looks Like

Who Can Edit Locked Data

Only EPA staff and admins can modify locked data, and only after review with proper justification/proof. If you discover a genuine error after submission, contact EPA to request a correction.

Rejected Submissions

If EPA rejects a submission, the underlying data is automatically unlocked so you can correct and resubmit. Read the reviewer's notes carefully before editing.

Annual Environmental Report (Form AER-1)

The Annual Environmental Report is the formal year-end return, submitted to your national regulator. Eden builds it from your monthly data plus a few narrative fields. The AER-1 layout Eden ships with is Ghana’s; other countries name and lay out their return differently, and your regulator will tell you which form it expects.

The Six Sections

SectionContentsSource
AFacility & permit informationManual entry
BContact personManual entry
COperations & productionAuto from monthly data
DWaste generation & managementAuto from monthly data
EEnvironmental incidents & complianceAuto from monthly data
FCertification & signatureManual entry

Building the Report

1
Enter monthly data first. Sections C, D, E pull live from the Operations & Waste page.
2
Open EPA Reports → Create New. Pick the monitoring year. Eden creates a draft.
3
Fill in narrative sections — facility info, contact, operations description, waste disposal methods, corrective actions, planned improvements.
4
Sign Section F — preparer name, designation, date.
5
Save & print. The PDF generates a full A4 landscape document with all 6 sections, monthly pivot tables, and signature lines.
💡 Always edit the source. If pivot data looks wrong, click Edit monthly data from any section — you'll be taken to the Operations & Waste page to fix the underlying entries.

Cover Pages on Reports

Every PDF report Eden generates now starts with a professional cover page featuring:

Subsequent pages have a running header (company logo + name + report type, with year/quarter on the right) and a footer (Eden attribution, generation date, page X of Y).

This applies to:

The Environmental Performance Certificate retains its purpose-built single-page design (with the company logo embedded in the spine).

Reading Your Dashboard

The Company Dashboard is your daily overview — what's been entered, what's pending, and how compliance looks.

Welcome Bar

Top of every dashboard. Greets you by name, shows your current company and undertaking type, and offers quick links to Data Entry and Reports.

Stat Cards

Compliance Ring

A circular progress ring showing overall compliance %. Tooltip explains the calculation. Companies see their data completeness; EPA sees compliance vs limits.

Recent Activity

Latest data entries, submissions, and audits in a single timeline.

The Colour Grade

Every company on Eden carries one colour for each reporting year. It is the single figure a regulator quotes, a bank asks for and a buyer checks, and it appears on the evaluation register, on the certificate and at the top of every report.

Gold
Green
Blue
Orange
Red

Best to worst. Gold, green and blue are compliant. Orange and red are not.

What each band means

BandGradeWhat it says about the year
GoldA+Every indicator at its best. No exceedance recorded, nothing outstanding.
GreenACompliant throughout, with minor room for improvement on at least one indicator.
BlueBCompliant. Several indicators have improvement opportunities.
OrangeCBelow the compliance band. Corrective action is required.
RedDNon-compliant. Immediate corrective action is required.

The colour is the worst of eight, not an average

Eden grades eight indicators separately, each getting its own colour, and the company takes the lowest of the eight.

IndicatorWhere the score comes from
Legal and administrative complianceAudit
Hazardous and toxic waste managementAudit
Compliance rate, toxic dischargeMonitoring readings, or the audit section where no toxic parameter is monitored
Compliance rate, non-toxic discharge and noiseMonitoring readings
Monitoring and reporting rateHow much of what was due has been filed
Best practice environmental managementAudit
Complaint managementAudit
Corporate social responsibilityAudit
One weak indicator sets the colour. A company scoring 100 on seven indicators and 89 on the eighth grades orange, not gold. This is deliberate: a grade is a floor, not a mean. It is why the overall score shown beside the band is often far higher than the band suggests — the score is a weighted average, the band is the floor, and the two answer different questions.

One toxic exceedance grades red

A single reading above the limit on a parameter marked toxic grades the whole company red. Not a threshold, not a band — one. A year with one arsenic result over its permitted level is not a 99%-good year, and averaging it away is exactly how a serious discharge disappears into a good-looking score.

The rule works from the readings, not from an officer's opinion, and it overrides everything else. Which parameters count as toxic is set by the regulator on the parameter record; heavy metals, cyanide and arsenic typically do, while dust, BOD and noise are ordinary banded parameters.

What this looks like. In the demonstration data, Costa Verde Mineracao scores 100 on seven of its eight indicators and carries a weighted score of 99.2. It grades red, on one arsenic reading of 0.26 mg/l against a limit of 0.2. Open its evaluation report and the reason is the only line not in gold.

The same colour everywhere

The band on the certificate, on the evaluation register, on the full report and on the comprehensive report is one and the same figure. If they ever disagree, that is a fault worth reporting — they are all reading the same evaluation.

If the regulator has not yet issued the evaluation for the year, Eden still shows the band the record would produce, marked provisional. It becomes final when the regulator generates the evaluation report. Viewing it never creates one.

The supporting breakdown

Beneath the band, each document shows three supporting figures, each on its own 0–100 scale: your compliance rate (readings within their permitted limits), your data completeness (entries filed against entries due so far this year) and your audit result. Together they produce the weighted score shown beside the band.

They are supporting analysis, not the rating — the rating is the band, and the band is the worst of the eight indicators. Improving a supporting figure without lifting the lowest indicator moves the score and not the colour. Where a company has not been audited at all, the audit part is set aside rather than counted as zero.

Your regulator can tell you the exact weighting and where each band begins. It is not printed here, because a target is not the point: the band is set by your weakest indicator, so the way to a better colour is to fix that one.
Data completeness counts only the months that have come due. In March, a company that has filed January and February reads 100%, not 17%. A finished year divides by twelve; the year in progress divides by the months elapsed.

How to move up a band

Because the band is the floor, there is only ever one thing to fix: the lowest indicator. Open the evaluation report and read down the eight — the one matching the overall colour is the one holding the company there. Improving anything else changes the score and not the band.

  1. Find the indicator at the company's colour — on the evaluation report, or in the Holding the rating list on the certificate.
  2. Check whether it is data or audit — a monitoring indicator moves when the readings or the filing record move; an audit indicator moves only at the next audit.
  3. Deal with any toxic exceedance first — while one stands, no other improvement can lift the company above red.
  4. File the outstanding returns — the monitoring and reporting rate is the indicator companies most often overlook, and the easiest to fix.

Certificates & Performance Records

Eden issues one document per company per year, and which document it is follows the colour grade. Open it from Companies → Certificate, or from the certificates list, which shows every company's band for the year before you open anything.

BandDocumentReadsClass
GoldCertificateExcellencePlatinum
GreenCertificateMeritGold
BlueCertificateComplianceSilver
OrangePerformance recordImprovement requiredProvisional
RedPerformance recordNon-complianceWithheld
Orange and red are not awards. They print as a performance record stating the assessment, with the certificate marked withheld and the indicators that caused it listed. A company with an unresolved toxic exceedance cannot be handed a document that reads like a commendation — the paper has to say what the register says.

What is on the document

When to issue it

Issue after the year's submissions have been accepted, not before. A document generated mid-year reflects a partial record — the completeness figure is calculated against the months elapsed, so it will read plausibly and still describe an unfinished year. The document carries the date it was produced and is valid for twelve months from issue.

Printing. Print opens the printable edition, typeset for one A4 landscape sheet: the whole document, including the band colour, the issuing regulator and the indicators behind the rating, on a single page with nothing carried over. Printing the on-screen view directly also produces one sheet, but the printable edition is the one laid out for paper. Browsers drop background colour by default — if the band comes out white, turn on Background graphics in the print dialogue.

The Sustainability Suite & Action Board

Company

Open Sustainability Suite from the sidebar. The suite extends Eden beyond EPA compliance, using the same data you already record. Switch between its areas with the selector at the top of the suite sidebar:

AreaWhat it is for
Places & indicatorsYour sites and areas on a map, the shared indicator library, and observations with their evidence and checks
ComplianceLimits, permits and obligation calendars for every country you operate in
CarbonGreenhouse-gas inventories, reduction targets, product footprints and suppliers
ESGSustainability reports for GRI, ESRS, IFRS S1/S2, TCFD, SASB, CDP and more
Health & safetyIncidents, chemicals, occupational health, contractors and permits to work
RiskRisk registers, controls, key risk indicators and climate risk
AnalyticsForecasts, anomaly checks and your compliance risk score
IntegrationsSensors, site gateways and connections to other systems

Start with your facilities

Under Shared setup → Facilities, add each site and choose its country. Every limit, obligation and sensor reading is matched to the right rules through the facility.

The Action Board

Anything that needs doing — a limit exceedance, an incident investigation, an overdue obligation, a risk treatment, an early warning — becomes an action on one shared Action Board. Filter by status or source, assign an owner and due date, and mark actions done when complete.

💡 Enter once, use everywhere. A figure recorded in one area (for example energy use in Carbon) is reused automatically by the others (ESG reports, risk indicators), so you never type it twice.
The Sustainability Suite home, with each area and the actions needing attention.

Places, Indicators & Evidence

Company Regulator

Eden records where environmental work happens and what was measured there in one shared way, so the same reading can serve a permit, a report to a donor and a research study without being typed three times. It is the foundation the wider Eden modules (biodiversity, climate, water and others) build on.

Open Sustainability Suite and choose Places & indicators from the switcher at the top of the sidebar. Its pages are:

PageWhat it is for
OverviewYour places on a map, the values waiting to be checked, and what was recorded most recently.
MapEvery place you can see, with the latest value of any indicator laid over it.
PlacesSites, stations, habitats, protected areas, watersheds — anything with a location.
ObservationsEvery value recorded, and how far each one has been checked.
Indicator libraryWhat can be measured, with its unit and method, plus your methods and data sources.
ModulesWhich parts of Eden your organisation uses.

Every value carries its provenance

A number is only as useful as the answers to the questions somebody relying on it will ask. Eden keeps seven answers with every observation and shows them as a row of links at the top of the observation, ticked when present and marked with a dash when missing:

  1. Source — where it came from: a survey team, a station, a laboratory, a published dataset.
  2. Date — when it was observed.
  3. Location — the place, or an exact GPS position.
  4. Method — how it was measured, ideally a named standard.
  5. Evidence — a certificate, photo or field sheet that backs it up.
  6. Validator — somebody other than the person who recorded it, who has checked it.
  7. Confidence — how sure that person is: low, medium or high.
💡 A complete chain is what makes a number usable outside your organisation. A permit decision, a donor report or a published study can tell a validated reading from a figure typed in once and never looked at again.

Who sees what

Every place, observation, method and data source belongs to one organisation — your company's workspace, or for regulators, your agency — and you choose who else may see it:

ChoiceWho can see it
Only my organisationYour own team. This is the default.
My organisation and the regulator of the country it's inAlso that one country's regulator. EPA Ghana sees what a Ghanaian site shares with the regulator; NESREA does not.
Everyone on EdenEvery signed-in user of the platform.

The country a record belongs to is taken from your organisation's country, so a share always reaches the right regulator. A regulator who can see a company's record can read it but never change it, and the same holds the other way round.

Adding and Managing Places

Company Regulator

A place is anywhere you measure, protect, restore or regulate. Open Places and click Add a place.

About the place

Kinds of place
Site or premises · Facility or installation · Monitoring station · Sampling point · Survey plot or quadrat · Survey transect · Habitat or ecosystem patch · Protected area · Key Biodiversity Area · Forest · Wetland · Mangrove · Coral reef or seagrass · Coastal stretch · Watershed or catchment · River, lake or reservoir · Borehole or well · Waste site or dumpsite · Restoration area · Project area · Community or settlement · Administrative area · Hazard zone · Other

Where it is: three ways

  1. Draw it on the map. Use the tools on the left of the map: a marker for a station, a line for a river reach or transect, a polygon or rectangle for an area. Drawn shapes can be edited or deleted with the same tools, and Clear the shape removes them all.
  2. Type a latitude and longitude for a single point, in decimal degrees — for example 5.6037 and -0.1870. Latitude runs north–south (−90 to 90), longitude east–west (−180 to 180).
  3. Upload a boundary you already have: GeoJSON, KML, or a shapefile zipped together with its .shp, .shx, .dbf and .prj files, up to 8 MB. Boundaries in another coordinate system, such as UTM, are converted automatically. An upload replaces anything drawn.

Eden works out the area in hectares and, for lines, the length in kilometres from the shape itself. Areas are calculated on the true shape of the Earth, so they match a survey rather than a flat map.

⚠ Three things Eden refuses. A shape whose edges cross each other (redraw it without overlaps); a shapefile without its .prj file, because its coordinate system would be a guess; and a shape outside the world, which usually means latitude and longitude were entered the wrong way round.

The place page

Each place shows its map, its details, the observations recorded there, and two lists of what it contains: places recorded as inside it (through Sits inside) and places lying within its boundary. The second list is worked out from the shapes themselves, so a monitoring station inside a wetland appears there even if nobody linked them.

Retiring a place

A place with observations recorded against it cannot be deleted, because those values would lose their location. Edit it and untick In use instead: it leaves your lists and forms, and everything recorded there is kept.

Recording and Checking Observations

Company Regulator

An observation is one measured value: a PM2.5 reading, a rainfall total, a count of birds, a seedling survival rate. Click Record an observation, or Record here on a place page to have the place filled in.

What, where and when

Automatic checks

Every value is checked as it is saved. Nothing is refused by these checks — a real flood or heatwave produces real extremes, and they must be recordable — but a value that trips one is marked Flagged for review, with the reason shown on the observation:

Attaching evidence

After saving, attach what backs the value up on the observation page: a laboratory certificate, a photo, a field sheet, or a link. Files up to 15 MB are accepted in these formats: PDF, JPG, PNG, WEBP, HEIC, CSV, XLSX, XLS, DOCX, TXT, JSON, GeoJSON, KML, ZIP and MP4.

Eden records a fingerprint of each file. While the file is the one that was attached, it shows Unchanged; if it is ever replaced, it shows File changed since attached. Evidence can be downloaded only by people allowed to see the observation.

Validating a value

Under Check this value, somebody in the organisation that owns the value chooses one of:

ActionWhat it needsWho
ValidateHow confident you are — low, medium or highAnyone in the organisation except the person who recorded it
RejectA note saying whyAnyone in the organisation — the recorder too, to withdraw a value entered by mistake
Flag for reviewA note saying whyAnyone in the organisation, including the recorder
Reopen—Anyone in the organisation
⚠ Nobody can validate a value they recorded. A check you run on your own work is not a check. If you work alone, ask a colleague to be the second pair of eyes.

Editing a value that has been validated sends it back to be checked again — the validation was of the old value, not the new one. It returns as Not yet checked, or as Flagged for review if the automatic checks find something in the new value. Rejected values stay on record but never appear on the map.

The History at the bottom of each observation lists every step — recorded, flagged by the automatic checks, validated, rejected, edited — with who did it and when. It cannot be edited.

Values waiting for a check are listed on the Overview under Waiting to be checked.

The Indicator Library

Company Regulator

The Indicator library holds the definitions everybody measures against, so two teams recording "PM2.5" record the same thing in the same unit. It has three tabs: Indicators, Methods and Data sources.

The shared Eden library

Entries marked Eden library are maintained by Wisdsol and available to every organisation: 38 indicators covering air, water, soil, noise, climate, biodiversity, forests, coasts, waste and energy, and 17 standard methods such as ISO 7027-1 for turbidity and EN 12341 for particulate matter. They cannot be edited by an organisation.

An indicator, field by field

⚠ A plausible range is not a legal limit. It exists only to catch typing errors. Permitted limits are set by each country's regulator under Limit values, and are what compliance is judged against.

Adding your own

Click Add your own on any tab. What you add belongs to your organisation and is visible to whoever you choose, like any other record. Methods name a standard or protocol and how it is applied. Data sources record who operates or publishes the data, a link, the licence it may be used under, and how to cite it.

The Map

Company Regulator

The Map page shows every place you are allowed to see, coloured by kind: protected areas and forests in greens, water bodies and wetlands in blues, monitoring stations in purple, hazard zones in red. Click a place for its name, kind and area, and a link to its page.

Values are coloured from green to red following the indicator's own direction: where lower is better, red is high; where higher is better, red is low. Indicators with no direction are shown in a single colour, because a colour would imply a judgement nobody has made. Rejected values are never shown.

💡 Very large areas. The map draws up to 2,000 places at once and says when it is showing only part of what exists. Filter by kind to see the rest.

The map uses OpenStreetMap, so it needs an internet connection; the shapes and values themselves come from Eden.

Choosing Your Modules

Company Regulator

Eden is one platform with many modules. The Modules page lists all of them, grouped by family — Eden Core, Compliance, Climate, Biodiversity, Research, Monitor, GIS, Projects, ESG, Finance and Intelligence — and shows which your organisation uses.

Shown asMeaning
Always onPlaces, indicators & evidence; Shared setup; and Regulatory intelligence. Everything else depends on them.
On / OffField & laboratory monitoring, Carbon accounting, Enterprise & climate risk, ESG reporting, Health & safety, Predictive analytics, and Integrations & sensors. All are on until your organisation switches one off.
Off until switched onThe 19 modules that start switched off: Biodiversity & ecosystems, Land, soil & forests, Marine & coastal, Natural capital & ecosystem services, Climate indicators & research, Physical climate risk, Adaptation planning, Impact assessment (EIA / SEA), Waste & circular economy, Water resources, Satellite & remote sensing, Early warning & alerts, Community & citizen reports, Projects, MEL & results, Climate & environmental finance, Carbon & nature markets, Research portal, Open data hub and Environmental assistant. Each is described in the chapters that follow; an administrator switches on the ones your organisation needs.

Switching a module on or off

Click Switch off or Switch on beside the module. Only an administrator can: the owner of a company's workspace or an organisation admin of a company in it, and for a regulator, the agency administrator. Everyone else sees the page read-only.

Who Can Publish to Everyone

Company Regulator

Every record is visible to only my organisation (the default), my organisation and the regulator of its country, or everyone on Eden. An administrator decides on the Modules page who may choose "everyone": nobody, only administrators (the default), or anyone who can edit the record. Whoever publishes ticks a confirmation each time, and every publication is recorded in the security log.

Working in the Eden Modules

Company Regulator

The 19 modules that start switched off — from biodiversity to the environmental assistant — all work the same way, so what you learn in one carries over to the rest. Once an administrator switches a module on (see Choosing Your Modules), it appears in the switcher at the top of the sidebar.

The screens every module has

ScreenWhat it does
OverviewThe module's headline numbers, the tables that need attention, how many records of each kind you hold, and a map of everything in the module that has a location.
A list for each kind of recordSearch, filters, and Download CSV — the CSV holds exactly the rows the list shows you, with the filters applied.
The record's pageIts details; a Worked out box with what Eden calculates from it; the records filed under it; its location on a map; and Next steps — buttons such as Confirm, Close the manifest or Publish to the open data hub.
Add / EditOne form. Records with a shape — a patch of deforestation, a detected change, a citizen report — have a map to draw on, a latitude and longitude to type, or a boundary file to upload.

Records filed under another

Some records only exist as part of another: a sighting belongs to a survey, a disbursement to a grant, a mitigation measure to an impact. Add them from the parent's page, with the + Add link beside the table. They always take the parent's owner and its Who may see it choice: share a survey with the regulator and its sightings go with it; make it private again and they follow. You can only file a record under a parent your organisation owns.

Who sees what

Exactly as for places and observations: Only my organisation, My organisation and the regulator of the country it's in, or Everyone on Eden. Every list, map, dropdown, export, dashboard number and answer from the assistant is cut to what you may see. A record you may not see does not exist as far as Eden is concerned: its address answers "not found".

💡 Some lists start with shared entries. The species list and the adaptation options library include entries Eden provides for everyone. You can use them in your own records, and add your own beside them, but only Eden's staff change the shared ones.

A record that other records still depend on — a species with sightings, a waste stream with manifests — cannot be deleted; Eden says so and leaves it in place.

Biodiversity, Land, Marine & Natural Capital

Company Regulator

Biodiversity & ecosystems

Add a Survey (where, when, the method and the effort in person-hours), then the Sightings made during it: the species and how many individuals. Choose species from the Species list, which records each one's IUCN Red List status, any national protection, and whether it is invasive or endemic. A survey's page works out:

With no individuals there is no index — Eden shows a dash rather than a misleading zero. Habitat condition records an assessment of a place: good, fair, poor or severely degraded, with an optional 0–100 score and the threats seen.

Land, soil & forests

Loss & degradation records deforestation, degradation, soil loss or conversion, with its cause. Draw the area on the map and Eden measures it in hectares the same way it measures places. A new record is Detected; from its page mark it Verified on the ground, a False alarm (with the reason), and later Action taken.

Restoration projects hold their Plantings and Survival checks. A survival check counts a sample of seedlings and how many are alive; the project's page shows the latest survival rate and the estimated number still alive — planted × the latest survival rate. It is an estimate, and labelled as one.

Marine & coastal

Natural capital & ecosystem services

Record the Natural assets you rely on — a forest, a wetland, an aquifer — and the Ecosystem services each provides, grouped as provisioning, regulating, cultural and supporting. A service may carry a value a year, but only with the method used (market price, replacement cost, avoided damage, benefit transfer or a stated-preference survey). Values in different currencies are shown side by side and never added together. Dependencies & impacts screens what your activities depend on, or do to, nature, rated from very low to very high.

Climate Indicators, Risk & Adaptation

Company Regulator

Climate indicators & research

A climate indicator names an indicator from your library (rainfall, maximum temperature…) and a place, and a baseline period such as 1991–2020. Eden works everything out from the observations already recorded there — no second copy of the data:

Rejected values are left out. A climate indicator shared more widely than private only uses readings shared at least as widely, so a public figure is never built from private data. Projections keep what downscaled climate projections say — the variable, the scenario (SSP1-2.6 to SSP5-8.5), the horizon, the central change and its range — and the source it came from. Eden does not run climate models.

Physical climate risk

Record each Hazard — flood, drought, extreme heat, sea-level rise and others — for today or a future scenario, with its level from 1 to 5. A Risk assessment scores a place against a hazard:

Risk = hazard × exposure × vulnerability, each 1–5, so from 1 to 125.

ScoreBand
1–12Low
13–36Medium
37–64High
65–125Very high

Adaptation planning

An Adaptation plan holds its Actions. Start an action from the Options library (mangrove restoration, early-warning systems, rainwater harvesting, cool roofs and others), link it to the risk it reduces, and give its cost and the losses it avoids in the same currency. Eden works out the benefit–cost ratio — above 1, an action pays for itself — ranks actions by it, and shows the plan's progress as the average of its actions, leaving out dropped ones.

Impact Assessment, Waste, Water & Remote Sensing

Company Regulator

Impact assessment (EIA / SEA)

An assessment moves through eight stages: Screening, Scoping, Baseline studies, Impact assessment, Review, Decision, Monitoring and compliance, and Closed. Press Move to the next stage on its page; Eden refuses, and says why, until the stage's work is on file:

To leaveEden needs
ScreeningThe screening category. Category C needs no assessment and goes straight to Closed.
ScopingAt least one impact identified.
Baseline studiesA summary of what they found.
Impact assessmentEvery impact rated; a mitigation measure for every moderate or major negative impact; at least one public consultation.
DecisionThe decision. Approved with conditions needs the conditions; a refused project can only be closed.
MonitoringEvery condition complied with.

Each impact is rated by magnitude × sensitivity of the receptor, each 1–4: 2 or less is negligible, 4 or less minor, 8 or less moderate, above 8 major. A decision can only be recorded at the Decision stage. Tick Strategic assessment (SEA) for a policy, plan or programme.

Waste & circular economy

A Manifest follows one consignment from dispatch to the facility that took it. When the facility's weight is recorded the manifest is Received; if it differs from the dispatched weight by more than 5% it is flagged, and it cannot be closed without saying why. Hazardous waste cannot be sent to a facility not recorded as accepting it, and a closed manifest can no longer be changed. The overview shows the share of waste kept out of disposal — reused, recycled, composted or burnt for energy — and facility licences expiring within 90 days.

Water resources

Record abstraction and discharge Licences with the volume each allows per day, month or year, and the water actually withdrawn or discharged over each period. Eden compares the volume with what the licence allows for the same number of days — over 100% is flagged — and refuses a discharge booked against an abstraction licence. Water stress divides a catchment's total demand by its renewable supply and bands it as WRI Aqueduct does: under 10% low, 10–20% low to medium, 20–40% medium to high, 40–80% high, 80% and over extremely high. Water quality readings are observations in Places & indicators.

Satellite & remote sensing

The Image catalogue lists the satellite and drone images you work from. A Detected change — forest loss, a burn scar, a flood extent, new mining — is drawn on the map, measured in hectares, and must be Confirmed or marked a False positive by somebody other than the person who drew it. Redrawing a confirmed change sends it back to be checked. Eden does not process imagery itself.

Early Warning & Citizen Reports

Company Regulator

Early warning & alerts

An Alert rule says what to watch for:

The last two are checked once a day. A rule only ever sees your own organisation's readings — and, for a regulator, readings companies in its country have shared with the regulator. Each thing raises an alert once.

Under Who is told, add people by email, SMS or WhatsApp, each with the lowest severity they want (information, warning or danger). The alert carries the rule's advice. Every delivery is listed on the alert: Sent, Failed, or Not sent — channel not set up on this server when SMS and WhatsApp have not been connected; email is unaffected. From the alert's page, Acknowledge it and mark it Resolved.

Community & citizen reports Regulator

Members of the public report pollution, spills, dumping, fires, tree cutting, illegal mining, industrial accidents and other problems through Eden Report, the public app at /report/ — no account needed. It works in any phone browser and can be installed on the home screen like an app. In three short steps they choose their country and what is happening (ticking Someone is in danger if it is urgent), mark the place on the map or tap Use where I am, and describe it, with a photo if they have one. Only countries whose regulator has switched this module on are offered, and each report belongs to that regulator from the moment it arrives.

Work a report from its page: Start looking into it, then Confirmed or Could not be confirmed (with a note), Action taken, and Close.

The app also has Get help, for questions to the Eden team about the platform itself — those go to Wisdsol Tech's support, not to you, and are listed for platform staff in the administration area under Contact messages, with the contact page's messages.

Projects, Finance & Carbon Markets

Company Regulator

Projects, MEL & results

A Project holds its logframe — Results at the impact, outcome, output and activity levels, each contributing to one above it — and each result its indicators with a baseline and a target. Add Measurements as they come in. Progress is how far the latest value has moved from the baseline towards the target, so it works for a reduction (cases down from 200 to 50) as well as an increase. The project's page also shows its milestones, budget lines and money spent, and funding opportunities that may fit it.

Climate & environmental finance

Keep the Funders you work with and their Opportunities: themes, the countries they are open to, amounts and deadline. Eden suggests opportunities for each project that is still open: a shared theme, the project's country (or a call open to all countries), and a deadline not yet passed. It is a suggestion, not an eligibility check. Follow Applications from idea to award, and record Grants and the Disbursements actually received — never more in total than the grant.

Carbon & nature markets

A Credit project — carbon, biodiversity, water or other nature units, under Verra, Gold Standard, Plan Vivo, Article 6 or a national registry — holds:

The project's page shows issued, retired and the balance, vintage by vintage.

Research, Open Data & the Assistant

Company Regulator

Research portal

Record Research projects, their Datasets and Publications. Each dataset keeps its Versions: a data file of up to 50 MB (CSV, spreadsheets, JSON and GeoJSON, GeoPackage, KML, NetCDF, GeoTIFF, Parquet, PDF or a zip of them) fingerprinted with SHA-256 so anyone can confirm a copy is unaltered. A version keeps its file; a correction is a new version. A Review must be written by somebody other than the person who filed the dataset or the version.

Open data hub

Press Publish to the open data hub on a dataset's page. Eden publishes it only if your organisation has the Open data hub switched on, the dataset is shared with Everyone on Eden under an open licence, and it has at least one version. Published datasets appear in the public catalogue at /eden/data/ and in the read-only API at /eden/api/v1/datasets/, with their licence, citation and checksums. Withdraw from the hub takes one down; switching the module off takes them all down at once.

Without a key the API returns published datasets only, up to 120 requests an hour. An API key from this module also returns your organisation's own unpublished datasets — never anybody else's — up to 2,000 requests an hour. Press Issue a new key and copy it straight away: Eden keeps only a fingerprint and cannot show it again.

Environmental assistant

Ask in plain words: What expires in the next 60 days?, Which places have the highest climate risk?, What is waiting to be checked?, Latest PM2.5 at Tema station, Trend of rainfall at Kumasi, What is overdue?, Carbon credit balance, and similar questions about species, alerts, survival rates and forest loss.

The assistant is not a chatbot that guesses. Each answer is worked out exactly from records you are allowed to open, in modules your organisation has switched on, and says what it was worked out from. A question it does not recognise gets a plain I can't answer that and a list of what it can.

Multi-Country Compliance

Company

The compliance module answers one question well: which limit governs this measurement? A company operating in three countries is subject to three sets of law at once, and the answer differs by country, by sector, sometimes by the zone a plant sits in and the time of day. The module resolves that, keeps your permits and deadlines, and tracks changes in the law.

Telling Eden where you operate

Open Company Profile → Where you operate, or Compliance → Operating in. Add each country, with the local entity name and registration number if they differ from the parent company. One country is the main one; it fills your workspace country, which in turn suggests language, time zone and currency.

Adding a country does two things at once: its rules start applying to you, and that country's environmental regulator can see your submissions. Removing it reverses both.

How Eden chooses the limit that applies

A single parameter can have several limits: your own internal standard, a national limit, a sector-specific limit and an international guideline. Eden resolves them in a fixed order, and always shows which one it used and why.

RankSourceBeats
1Your own internal standard, marked as overridingEverything below
2The most specific jurisdiction — a district beats its country, which beats a regional blocBroader jurisdictions
3Within one jurisdiction, the most narrowly scoped limit — sector or undertaking specificGeneral limits
4Binding statutory limitsAdvisory guidelines (WHO, IFC)

Use Limit finder to check any parameter before you rely on it. Type the parameter, pick the medium and facility, and Eden shows the value, its source and the reasoning. A blank field on a limit means applies to all, so a limit with no sector set applies to every sector.

Internal standards

Under Compliance → Company standards you can set a limit tighter than the law requires — common practice for operators who want a margin before a statutory breach. A standard can apply company-wide or to one facility. Mark it overriding only if it should replace the statutory limit in compliance checks; otherwise it is recorded as an internal target alongside the legal one.

⚠ An internal standard never lowers your legal obligation. Setting one looser than the statutory limit does not make the looser figure lawful; Eden still evaluates against the statutory value.

Permits

Record every permit with its number, issuing authority, issue and expiry dates, and its conditions. Set renewal lead days to however long your authority takes to process a renewal — Eden raises the renewal action that many days before expiry, not on the expiry date itself.

The compliance calendar

An obligation is something you must do repeatedly: a quarterly report, an annual return, a monitoring round. Give it a frequency and a first due date, and Eden generates dated instances forward from there.

1
Create the obligation — Title, frequency, first due date, the facility it applies to and who owns it.
2
Set the lead time — How many days before the due date the work should start. The action appears then.
3
Work the calendar — Each instance is open, done or overdue. Marking one done rolls the next one forward.

Overdue obligations feed the compliance risk score, so an ignored calendar shows up in your risk figure rather than staying invisible.

Regulatory changes

Regulatory changes lists new and amended rules matched to the countries and sectors you operate in. Each one is recorded with a status: not yet assessed, assessed as relevant, or not applicable. Recording why a change does not apply to you is as valuable as acting on one that does — it is the evidence an auditor asks for.

The exceedance register

Every measurement Eden checks against a limit is recorded here, whether it passed or failed, with the limit used and its source. Exceedances are what a regulator asks about, and the register is your record of how each was identified and handled.

Verify every limit against the regulation it came from. Limits supplied with Eden are a starting point, whichever country they belong to. Law changes, and a number that was right when it was entered may not be right today. Confirm each against the current official instrument before relying on it for a submission. Your regulator can do this for the whole country at once under Configure my country.

Carbon Accounting — Scope 1, 2 and 3

Company

Carbon accounting measures the greenhouse gases your company is responsible for, in tonnes of CO₂ equivalent (tCO₂e). Eden follows the GHG Protocol Corporate Standard, which divides emissions into three scopes.

ScopeWhat it coversTypical examples
Scope 1Fuel you burn yourself, and gases you release directlyKiln and boiler fuel, site vehicles and plant, refrigerant leaks, generators
Scope 2Energy you buy and consumePurchased electricity, purchased steam, heating and cooling
Scope 3Everything else in your value chain, up and downstreamPurchased goods, business travel, employee commuting, waste, freight, use of sold products

Scope 1 and 2 are normally required first because you control them directly. Scope 3 is usually the largest, and the hardest to measure, because it depends on data from other companies.

Building an inventory

1
Create the inventory — One per reporting year, with its start and end dates. State the consolidation approach — operational control is the most common — and describe what is in and out of the boundary.
2
Define emission sources — Each thing that emits: a kiln, a vehicle fleet, an electricity supply. Give it a scope, a category and the facility it belongs to.
3
Enter activity data — What was consumed, in its natural unit: litres of diesel, kWh of electricity, tonnes of waste. Enter it per quarter or per month — smaller periods make errors easier to find.
4
Calculate — Eden multiplies each activity by the right emission factor and totals by scope.
5
Review and submit — Check the result, then submit to lock the inventory so figures cannot shift under a report that cites them.

Emission factors

A factor converts an activity into emissions — for example kilograms of CO₂e per litre of diesel. Eden picks the factor by activity key, jurisdiction, year and scope, preferring one that matches your unit exactly.

💡 Unmatched rows are reported, never silently ignored. If an activity has no matching factor, the calculation lists it rather than quietly counting it as zero — a low total you cannot explain is worse than an obvious gap. Add the missing factor, or correct the activity key, and calculate again.

Scope 2: two numbers, both correct

Scope 2 is calculated twice, because the GHG Protocol requires both:

Report both. A market-based figure alone, with no location-based number beside it, looks like an attempt to hide the grid.

Reduction targets

A target states how much you will cut, from which base year, by when. Eden supports absolute targets (total tonnes down by X%) and intensity targets (tonnes per unit of production or revenue). It plots your trajectory against the required path so you can see drift early.

Mark a target science-based only once it has actually been validated, and record the validating body. An unvalidated target described as science-based is a reporting risk.

Product footprints and life-cycle studies

A product carbon footprint is the emissions of one product per declared unit — a tonne of cement, a litre of product. Build it from components, each with its own quantity and factor. A life-cycle study goes further, covering defined stages from raw materials to end of life, and can report impacts beyond carbon.

Supply chain and Scope 3

Register suppliers with their country, category, criticality and annual spend. For each, record whether they have a code of conduct and whether they report GHG data. Where a supplier gives you real figures, use them; where they do not, Eden estimates from spend. The supply chain page scores suppliers so you can see where to push for real data first.

ESG Reporting and the Frameworks

Company

ESG stands for environmental, social and governance — the three areas investors, lenders and large customers ask about. ESG reporting goes beyond permit compliance: it asks what your company does about climate, people and how it is run.

Several bodies publish frameworks saying what to disclose. Most companies must satisfy more than one. Eden holds one set of figures and maps it onto each framework, so you answer once.

The frameworks Eden supports

FrameworkWho it is forWhat it asks
GRI
Global Reporting Initiative
The most widely used worldwide; suits any company reporting to a broad audienceUniversal disclosures about the organisation, plus topic standards for each material topic
ESRS
European Sustainability Reporting Standards
Required for companies in scope of the EU CSRD, including some non-EU companies with EU operationsDetailed, mandatory datapoints across environment, social and governance, with double materiality
IFRS S1Investors; adopted or being adopted by many national regulatorsGeneral sustainability-related risks and opportunities that affect company value
IFRS S2The climate companion to S1Climate risks, scenario resilience, Scope 1, 2 and 3 emissions, transition plans
TCFD
Task Force on Climate-related Financial Disclosures
Widely requested by lenders and investors; now largely folded into IFRS S2Four pillars: governance, strategy, risk management, and metrics and targets
SASBInvestors looking for industry-specific metricsA short set of financially material metrics per industry
CDPCompanies asked to disclose by investors or large customersAn annual questionnaire on climate, water and forests, scored A to D-

Eden also carries BRSR, the UN SDG indicators and ISO 14001 mappings.

💡 They overlap heavily. Your Scope 1 figure answers GRI 305-1, an ESRS E1 datapoint, an IFRS S2 requirement, the TCFD metrics pillar and a CDP question. The Framework crosswalk page shows exactly which datapoints share an answer.

Materiality — deciding what to report

You are not expected to report everything. A materiality assessment decides which topics matter enough. Eden scores each topic two ways:

Scoring both is double materiality, which ESRS requires. A topic that is material either way goes in the report. Record who you consulted under Stakeholder engagement: an assessment nobody outside the company contributed to is hard to defend.

Producing a report

1
Sync your metrics — ESG → Company metrics → Sync pulls emissions, energy, water, waste, safety rates and compliance figures from the rest of Eden, so nothing is retyped.
2
Create the report — Give it a year, a period and the frameworks it must satisfy.
3
Build — Eden lists every datapoint those frameworks require.
4
Autofill — Datapoints Eden already knows are filled from your data, with the source recorded.
5
Check the gaps — The gaps page lists what is still unanswered. Complete those by hand.
6
Submit — Locks the report. Record any external assurance and its level.
⚠ Restating a figure. If a published number later changes, mark the metric as restated and give the reason. Silently changing a reported figure is the single fastest way to lose an assurance provider's confidence.

Health & Safety

Company

The health and safety module covers incidents, the rates calculated from them, chemicals, occupational health, contractors and permits to work.

Reporting an incident

Report everything, including events that hurt nobody. Each incident records what happened, where and when, who was involved, the immediate action taken, and two severities: actual (what did happen) and potential (what could reasonably have happened).

💡 Potential severity is the one that prevents the next accident. A spanner falling from scaffolding that hits nobody is a near miss with fatal potential. Rated on actual severity it disappears; rated on potential it gets investigated.

Classifications

ClassificationMeaning
Near missNo injury or damage, but there could have been
First aidMinor treatment only, no further consequence
Medical treatmentTreatment beyond first aid
Restricted workThe person could work, but not their normal duties
Lost timeThe person could not work at all for at least one full shift
FatalityA death

The classification drives the safety rates, so being accurate here matters more than it looks. Incidents marked notifiable remind you to inform the regulator within its deadline.

Safety performance — what the rates mean

Rates let a small site and a large one be compared fairly, by expressing injuries per fixed number of hours worked. Eden calculates four:

RateFormulaWhat it tells you
TRIR
Total recordable incident rate
recordable injuries × 200,000 ÷ hours workedOverall injury frequency. 200,000 hours is 100 full-time workers for a year, so TRIR of 2 means roughly 2 recordable injuries per 100 workers per year.
DART
Days away, restricted or transferred
(lost-time + restricted) × 200,000 ÷ hoursThe share of injuries serious enough to change what someone can do.
LTIFR
Lost time injury frequency rate
lost-time injuries × 1,000,000 ÷ hoursThe international (ILO) convention, used across most of Africa, Europe and Asia.
Severity ratedays lost × 1,000,000 ÷ hoursNot how often, but how bad — a single serious injury moves this sharply.
⚠ Enter hours worked first. Every rate divides by hours. Without them Eden shows the rates as blank rather than zero, because zero would read as "no injuries" when it really means "we cannot tell". Enter employee and contractor hours monthly, per facility.

TRIR and DART use 200,000 (the OSHA convention); LTIFR and severity use 1,000,000 (ILO). Never compare a figure on one base with a figure on the other.

Chemicals

Register each substance with its CAS number, hazard classes, hazard and precautionary statements, and signal word. Attach the safety data sheet. Track quantities and locations in the inventory, with segregation notes where substances must not be stored together.

A chemical risk assessment covers a task, not a substance: the same solvent is low risk poured into a beaker in a fume hood and high risk sprayed in a confined space.

Occupational health

A surveillance programme defines who must be examined, for what, and how often — for example annual audiometry for anyone in a high-noise area. Eden tracks who is due. Exposure monitoring records measured exposures and compares them against occupational exposure limits.

Eden records fitness status and follow-up dates only. Clinical details stay with your occupational health provider — Eden is deliberately not a medical record system.

Contractors and permits to work

Prequalify contractors before they work on site: insurance, safety record, competencies. Each contractor worker carries an induction date and expiry, and any competencies the job needs.

A permit to work authorises high-risk work — hot work, confined space, work at height, electrical isolation — after the controls are confirmed in place.

⚠ Eden refuses to issue a permit when a precondition fails — a lapsed induction, expired insurance, a missing gas test. An authorised person can override, but the override is recorded with its reason. An override that leaves no trace is the same as having no control at all.

Risk Registers and Climate Scenarios

Company

A risk register is the list of things that could go wrong, how bad each would be, what you do about it, and who owns it. Eden supports company-wide and facility-level registers.

Scoring a risk

Each risk is scored on two 1–5 scales, and the score is their product (1–25).

ScoreSeverity — how badLikelihood — how probable
1InsignificantRare
2MinorUnlikely
3ModeratePossible
4MajorLikely
5SevereAlmost certain

Score it twice. Inherent is the risk with no controls at all. Residual is what remains with your current controls working. The gap between them is what your controls are actually worth — and if there is no gap, the controls are not doing anything.

Set a target score for where the risk should end up, and a velocity for how fast it would arrive: a slow-moving risk leaves time to react, a fast one does not.

Treatment strategies

Controls and testing

A control is what keeps a risk down. Record whether it is preventive (stops the event) or detective (tells you it happened), and whether it is technical, procedural or behavioural. Mark the ones you cannot operate safely without as critical.

A control nobody tests is an assumption. Set a test frequency and record each control test with its evidence. Eden flags overdue tests, and a critical control that fails its test should move the residual score straight away.

Key risk indicators

A KRI is a number watched because it moves before the risk does — exceedances per month, overdue actions, contractor induction lapses. Set a green and an amber threshold and a direction (higher or lower is better); readings are then classified automatically.

Give a KRI a source key and Eden reads it from your own data on a schedule instead of waiting for someone to type it in.

💡 A good KRI is a leading indicator. "Injuries last month" tells you what already happened. "Overdue safety inspections" tells you what is coming.

Suggested risks

Suggest risks from data looks across Eden — recurring exceedances, repeated incidents, lapsed contractor approvals, missed obligations — and proposes draft risks a register probably ought to contain. Nothing is opened automatically: review each, keep what fits your business, and discard the rest.

Climate risk and scenarios

Climate risk assessment asks how your business fares under different futures. Eden distinguishes two kinds:

The scenarios

A scenario is a plausible future, not a prediction. You test the same business against several. Eden ships the ones reporting frameworks expect:

FamilyScenariosWhat they explore
IPCC (AR6)SSP1-2.6, SSP2-4.5, SSP5-8.5Physical climate outcomes, from strong mitigation to high emissions
NGFSOrderly transition, Disorderly transition, Hot house worldBuilt for financial institutions: how policy timing changes the damage
IEANet Zero by 2050, Announced Pledges, Stated PoliciesEnergy-system pathways — useful for energy-intensive operations

For each assessment, record the scenario, the time horizon (short, medium, long), whether the risk is physical or transition, its likely financial effect, and your response. IFRS S2 and TCFD both ask for this, and both ask you to show resilience under more than one scenario.

Use at least one high-emissions scenario and one strong-mitigation scenario. Testing only the comfortable middle answers nothing: physical risk peaks in one direction and transition risk in the other.

Predictive Warnings and Anomaly Detection

Company

Analytics looks at the monitoring data you already have and answers two questions: where is this heading? and does this reading look wrong?

Forecasts — where a parameter is heading

A forecast model reads one parameter from one source and projects it forward. Eden offers several methods:

MethodUse it when
LinearThe value drifts steadily up or down
HoltThere is a trend that itself changes — the usual choice
Holt-WintersThere is a repeating seasonal pattern, such as a rainy season
MeanThe value is basically flat and you want the normal range
EWMARecent readings should count more than old ones

Set the horizon (how many periods ahead) and the minimum points needed before it will run. A model with too little data is skipped and says so, rather than producing a confident line from four readings.

⚠ Read the confidence, not just the line. Every forecast carries a fit quality. A weak fit means the data is too noisy for the trend to mean much — treat it as a hint to look, not a number to act on.

Predictive alerts

When a forecast crosses a limit within the horizon, Eden raises an alert naming the parameter, the limit, and roughly when the breach is expected. The point is to act while it is still cheap: adjust the process, service the equipment, schedule the maintenance — before the exceedance is a matter of record.

Each alert can be turned into an action on the action board, or dismissed with a reason when you know why the trend is happening and it is expected.

Anomaly detection — readings that do not fit

An anomaly is a reading that does not fit the recent pattern. Most anomalies are not pollution events at all, and that is exactly why they matter:

The sensitivity setting controls how far from normal a reading must be before it is flagged. Lower it and you catch more real problems along with more noise; raise it and you see only the extremes. Start around 3 and adjust after a month of use.

Review each anomaly and mark it confirmed, explained or a data error. That feedback is what keeps the register useful — an unreviewed anomaly list is quickly ignored.

The compliance risk score

A single 0–100 figure for how much compliance risk the company is carrying, with bands from low to severe. It combines:

Each factor is capped, so no single input can dominate the score, and every contribution is written out in plain language beneath it.

💡 Always read the drivers, never just the number. Two sites can score the same for completely different reasons — one with many small exceedances, another with one overdue statutory report. A score you cannot explain to a site manager is a score they will ignore.

Sensors and Integrations

Company

Integrations bring data into Eden automatically: continuous monitoring devices in the field, and connections to systems you already run.

Devices and channels

A device is a physical instrument — an air quality station, a noise monitor, an effluent probe. Register it with a reference, its type, the facility it sits at, and its position. A channel is one measurement that device produces: one station may report PM2.5, PM10 and NO₂ on three channels.

Each channel maps to a parameter key so Eden knows which limit applies, and carries its unit, a valid range, and optionally a multiplier and offset for calibration correction.

Readings, and what happens to them

As readings arrive Eden stores them with a quality flag, checks them against the limit resolved for that parameter and facility, and marks any exceedance immediately. Readings outside the valid range are flagged rather than silently accepted.

Device health

Set a reporting interval and an offline after period. If nothing arrives within that period the device is marked offline, so a silent instrument is visible rather than looking like clean air.

⚠ A device that stops reporting is not good news. Gaps in continuous data are a compliance problem in their own right — check the offline list as part of your routine, not only when a reading looks odd.

Calibration and data quality

Record each calibration with its date and result; Eden tracks when the next is due against the device type's interval. Use data quality flags to mark periods when readings should not count — during calibration, a known fault, maintenance, or a power failure. Flagged periods are excluded from reporting, with the reason on record.

Excluding data is normal and legitimate. Excluding it without recording why is not — the flag and its reason are what make the exclusion defensible.

Connections to other systems

A connection links Eden to another system — ERP, HR, a utility portal, a laboratory information system. Field mappings say which field there corresponds to which field here. Sync jobs run on a schedule and record what was transferred, so a failed sync is visible rather than silent.

Webhooks let another system push data to Eden as it happens, instead of waiting for a scheduled pull. Each endpoint has its own secret, which can be rotated without disturbing the others.

Working Offline & App Updates

Eden needs an internet connection to load and save your data. This keeps your records accurate and private on shared devices, because no one else's data is ever stored on the phone or tablet.

⚠ Offline data entry is not available. Record field readings on paper or in a spreadsheet if you expect no signal, then enter or upload them once you are connected.

Keyboard Shortcuts

Ctrl + SSave data entry
Ctrl + PPrint current page
[Collapse or expand the sidebar
TabNext input
Shift + TabPrevious input
↑ ↓ ← →Navigate pivot grid cells
EnterSubmit form / save cell
EscClose modal / cancel
?Open help (where supported)

Troubleshooting

I can't log in

A module has disappeared from my menu

My boundary file is refused

I can't validate a value

The pivot grid is empty

Save fails / network error

The chart is blank

Print toolbar shows on the printout

The black toolbar at the top is hidden in print. If it appears, your browser may be set to print backgrounds — uncheck Headers and footers in print settings, or use Save as PDF directly.

Frequently Asked Questions

Can I edit a submitted submission?

No. Once submitted, you can only delete it (if EPA hasn't reviewed yet) or create a new submission. Contact EPA if a correction is needed for an accepted submission.

Why don't I see point scores during audits?

The point value behind each answer is hidden from auditors. This prevents scoring bias — an auditor picks the answer that matches what they observed, not the one that earns more points.

Why don't I see permissible limits on my data?

Companies can't see Min/Max compliance limits. This is intentional — it ensures companies report actual measured values rather than tailoring entries to known thresholds. EPA staff and admins see all limits.

Can my regulator see my places and observations?

Only the ones you choose to share. Each place and observation is set to Only my organisation, My organisation and the regulator of the country it's in, or Everyone on Eden. A regulator who can see one can read it but never change it.

Why was my value flagged when it is correct?

A flag is a request for a second look, not a judgement. Real extremes — a flood, a spill, a heatwave — fall outside the usual range and are flagged so somebody confirms them. Once a colleague validates the value, it stands as recorded.

Can I have data for past years?

Yes. Create a Monitoring Year for that year, then enter data normally. Eden treats every year as an independent context.

How do I add a parameter that's not in the list?

On the Data Entry page, click + Add custom parameter at the top of the pivot grid. The parameter is saved permanently and tied to your undertaking type, so other companies in the same industry will also see it.

How do I export data?

Use the Print button on any report or submission. The browser's Save as PDF option produces a digital copy. Excel/CSV export is available on Bulk Upload pages for round-trips.

What's the difference between EPA Submissions and the AER-1 Report?

EPA Submissions are periodic (monthly/quarterly/termly). The AER-1 is the annual formal report combining the entire year's data plus narrative sections. Both are valid regulatory deliverables.

Who can I contact for help?

For platform issues — your EPA Admin. For technical bugs — the system maintainer (Wisdsol Tech).

Glossary

AER-1
Annual Environmental Report Form 1 — the annual reporting template Eden ships with, Ghana’s, structured into Sections A through F. Other countries use their own return.
Audit Answer
A response option for an audit parameter, with an associated point value that auditors do not see.
Audit Category
A grouping of related audit questions, e.g. Air Quality, Waste Management.
Audit Parameter
A single question asked during an audit, e.g. Is emergency lighting functional?
Colour Grade (Band)
The one colour a company carries for a reporting year — gold, green, blue, orange or red. It is the worst of eight indicator colours, not a range on a score, and it appears identically on the register, the certificate and every report. See chapter 18.
Compliance Rate
% of monitoring values that fall within permissible limits. Visible to EPA only.
Data Completeness
Entries filed against entries due so far. A finished year divides by twelve; the year in progress divides by the months elapsed, so a company that is up to date in March reads 100%, not 17%.
EPA
Environmental Protection Agency, Ghana.
Evaluation Report
The regulator’s formal assessment for one company and year: the eight indicator scores and the overall band. It is the rating of record — every document reads its colour from here.
Evidence
A file or link that backs up an observation — a laboratory certificate, a photo, a field sheet. Eden keeps its fingerprint, so a file swapped after the fact shows as changed.
Indicator (grading)
One of the eight things a company is graded on. Two come from monitoring readings, six from audit sections. Each takes its own colour, and the lowest becomes the company’s band.
Indicator (measured)
Something that can be measured — PM2.5, rainfall, seedling survival — defined once in the indicator library with its unit and method, and recorded as observations.
Module
One part of Eden — carbon accounting, health & safety, places & indicators. An organisation’s administrator can switch most of them off; nothing is deleted when they do.
Monitoring Year
A 12-month reporting context. Each company can have one record per calendar year.
Observation
One measured value of an indicator, at a place and a time, with its source, method, evidence and checks.
Parameter
A specific environmental measurement (BOD, pH, NOx, etc.) with units and optional permissible limits.
Performance Record
What Eden issues instead of a certificate when a company grades orange or red. It states the assessment, marks the certificate withheld, and lists the indicators responsible.
Performance Score
The weighted figure shown beside the band, combining compliance rate, data completeness and audit result. Supporting analysis, not the rating — a company can score 99 and still grade red.
Permit / Permit Number
Official EPA authorisation to operate, with validity dates.
Pivot Grid
A spreadsheet-style table where parameters are rows and months are columns. Used for both data entry and report display.
Place
Anywhere Eden measures, protects or regulates — a station, a facility, a wetland, a protected area — stored with its real shape.
Plausible range
The values an indicator can realistically take. A value outside it is flagged for a person to check. It is not a legal limit.
Provenance
The seven answers kept with every observation: source, date, location, method, evidence, validator and confidence.
Sector
Top-level industry classification (Manufacturing, Mining, etc.). Companies belong to one sector via their undertaking type.
Toxic Parameter
A parameter the regulator has marked toxic on its record — heavy metals, cyanide, arsenic and the like. A single reading above the limit on one of these grades the whole company red.
Undertaking Type
Specific business activity within a sector, e.g. Cement Production under Manufacturing. Drives which parameters a company must monitor.
Validation
A second person in the organisation checking an observation and recording how confident they are in it. Nobody can validate a value they recorded.
Eden Environmental Compliance Platform · User Manual v1.1 · October 2026
Built by Wisdsol Tech · Confidential — for licensed use only